Quick Answer: How much does it cost to build a 30×50 house in Bangalore?

No of Floor Roof Area Cost per sft
Ground floor and First Floor or G+1 Floor 2400 1650
Ground floor, First Floor and Second Floor or G+2 Floor 3600 1600
Ground floor, First Floor, Second Floor and Third or G+3 Floor 4800 1550

How much will it cost to build a house in Bangalore?

The Scenario House Construction Cost in Bangalore As of Now May 2021

Sl No Plot Dimension Cost of Constructions – At Rs 1800 Per Sqft (Post Covid Impact)
1 30 by 40 Feet (1200 Sqft) 17.7 Lakhs
2 30 by 40 Feet (1200 Sqft) 35.5 Lakhs
3 30 by 40 Feet (1200 Sqft) 53.3 Lakhs
4 30 by 40 Feet (1200 Sqft) 71.1 Lakhs

How is construction cost per sq ft in Bangalore?

Built up Area : 13,000 sq ft. Details: G Floor Parking + 1st and 2nd 4Bhk Duplex House + 3rd and 4th Floor 2Bhk x 2nos on each floor. The current House construction cost in Bangalore 2020 varies from Rs 1500 /sq ft (Basic) to Rs 1900 /sq ft for a residential building.

How many sq ft is 30×40?

ft.; Area D = 40′ x 30′ = 1200 sq. ft.

What is the meaning of 30 * 40 site?

Square footage is calculated by multiplying width by length. So if a area is 30 foot wide by 40 foot long, 30 x 40 = 1200 square feet.

IMPORTANT:  Why does India smell like fire?

How many floors can we build in Bangalore?

In Bangalore, you can construct up to 4–5 floors in a 2,400 square foot plot.

How many rooms can 1200 square feet make?

Room size :12′*10′= 120Sqft. Built up permitted :0.5*1200 =600 Sqft. No of rooms :600/120= 5 nos.

How do you calculate building costs?

Approximate cost on various work of material to complete the construction for 1000 ft 2

  1. Total Cost. = Builtup area × Approx cost per sq. ft. = 1000 × 1000. = 1000000.00 Rs. …
  2. Amount of Aggregate Required. = Builtup area × 0.608. = 1000 × 0.608. = 608.00 Ton. …
  3. Flooring. = Builtup area × 1.3. = 1000 × 1.3. = 1300.00 Sq.

How much square feet is 40 * 60?

40×60 room = 2400 square feet

Therefore, the answer above can written as 2400 ft2.

Magic India