How much does it cost to build a 60×40 house in Bangalore?

Sl no The Statics of 40×60 House Construction cost in Bangalore for Rental / Duplex house Total Cost (Rs 1600/sq ft)
1 40×60 Ground Floor Rs 26 lacs
2 40×60 Ground+ 1 Floor Rs 58 lacs
3 40×60 Ground + 2 Floors Rs 90 lacs
4 40*60 Ground + 3 Floors Rs 1.25 cr

How much will it cost to build a house in Bangalore?

The Scenario House Construction Cost in Bangalore As of Now May 2021

Sl No Plot Dimension Cost of Constructions – At Rs 1800 Per Sqft (Post Covid Impact)
1 30 by 40 Feet (1200 Sqft) 17.7 Lakhs
2 30 by 40 Feet (1200 Sqft) 35.5 Lakhs
3 30 by 40 Feet (1200 Sqft) 53.3 Lakhs
4 30 by 40 Feet (1200 Sqft) 71.1 Lakhs

How much does it cost to build a 30×50 house in Bangalore?

House Construction Cost For Plot Size of 30×50 or 30’x50′ or 1500 square feet

IMPORTANT:  How many countries have Indian reservations?
No of Floor Roof Area Cost per sft
Ground floor and First Floor or G+1 Floor 2400 1650
Ground floor, First Floor and Second Floor or G+2 Floor 3600 1600
Ground floor, First Floor, Second Floor and Third or G+3 Floor 4800 1550

What is the construction cost per sqft in Bangalore?

The current House construction cost in Bangalore 2020 varies from Rs 1500 /sq ft (Basic) to Rs 1900 /sq ft for a residential building.

How many floors can we build in Bangalore?

In Bangalore, you can construct up to 4–5 floors in a 2,400 square foot plot.

What is the meaning of 30 * 40 site?

Square footage is calculated by multiplying width by length. So if a area is 30 foot wide by 40 foot long, 30 x 40 = 1200 square feet.

How many rooms can 1200 square feet make?

Room size :12′*10′= 120Sqft. Built up permitted :0.5*1200 =600 Sqft. No of rooms :600/120= 5 nos.

How many sq ft is 30×40?

ft.; Area D = 40′ x 30′ = 1200 sq. ft.

How much does it cost to build a 30×40 house in Mysore?

The 30×40 house construction cost for G Floor: Rs 17 lacs | G+1 Floor: 35 lacs | G+2 Floors: 49 lacs | G+3 Floors: 64 lacs | G+4 Floors: 79 lacs.

How do you calculate building costs?

Approximate cost on various work of material to complete the construction for 1000 ft 2

  1. Total Cost. = Builtup area × Approx cost per sq. ft. = 1000 × 1000. = 1000000.00 Rs. …
  2. Amount of Aggregate Required. = Builtup area × 0.608. = 1000 × 0.608. = 608.00 Ton. …
  3. Flooring. = Builtup area × 1.3. = 1000 × 1.3. = 1300.00 Sq.
IMPORTANT:  How can I send a letter to the Prime Minister of India by post?

How much does it cost to build a 10 by 10 room in India?

10*10 room construction cost in India:- in india, total construction cost for fully furnished one room 10*10 is around Rs 182700, this total cost includes cost of building construction, plastering, PCC flooring, tile flooring, electrical fitting, plumbing, painting putty and water and sanitization.

How much does it cost to build a 10×10 room?

Room Addition Cost

Room Size Average Cost
10×10 $8,600 – $15,500
10×20 $17,200 – $31,600
12×12 $12,400 – $22,300
16×16 $22,100 – $39,700

How much does it cost to build a 2 floor house in Bangalore?

The Cost to build a house on a 40×60 2400 sq ft site/plot in Bangalore for a 40×60 G Floor with 1600 sq ft BUA will cost Rs 29 lacs |40×60 G+1 Floor with 3580 sq ft BUA will cost Rs 62 lacs |40×60 G+2 Floors with 5580 sq ft BUA will cost Rs 91 lacs |40×60 G+3 Floors with 7580 sq ft BUA will cost Rs 1.30 cr |40×60 G+3 …

How much does a 600 square foot house cost?

To build a house in 600 sqft we need around 250 bags of cement that will cost us near 75,000 rupees. STEEL- Steel costs 45 rs/kg. We require around 1.5 metric ton (or 15 quintals) that costs us 67,500 rupees. SAND- It costs 50 rs/cubic foot (cuft) and we require 1100 cuft of this.